Easiest airradar diy lawn6/12/2023 ![]() It might also be good to physically mark the high and low spots with spray paint, stakes, or flags for future reference. Write down your findings for later reference. Repeat this measurement at several places around your foundation, including walkways and driveways. ![]() Thus, if the string is 6 ½ inches above the ground where it’s tied to the second stake, your calculations will come out to 0.065, or a grade of 6.5%. Divide this measurement by 100 to find the land grading measurement, expressed as a percentage by moving the decimal two places to the right.Measure the distance from the ground to the string on the second stake.Hang the level at the approximate midpoint of the string and adjust the height of the string on the second stake until the bubble is in the center of the level.Tie the other end of the string around this stake. Measure 100 inches away, or about 8 ⅓ feet, and pound the second stake into the ground just enough for it to stand up on its own.Tie one end of the string around the first stake and pound it into the ground right next to the foundation of your home until the string is at ground level.For this measurement, you’ll need two stakes, about 10 feet of string, a hanging string level, and measuring tape. The first step is to find out how large or small the existing slope is. ![]() On the other hand, yard grading can become a huge undertaking if you have a large, uneven, or steeply-sloped lawn. If you’re making minor adjustments to the strip of land around your foundation or other yard features, regrading your lawn is a relatively manageable project.
0 Comments
Leave a Reply. |